Finolhu Resort

Location – Finolhu Resort, Kanufushi Island Baa Atoll, Maldives
Client – HPS Maldives Pvt. Ltd
Project Status – Ongoing

Architectural, Structural and MEP Consultancy Services

This project included:

1. Assisting the client on the Design Concept provided to produce a detail drawings in compliance with the Maldives Regulatory Requirements as per Ministry of Tourism.
2. Structural Design were done as part of the scope for site implementation to ensure that the structure is done as per Maldives Standard.
3. Upon site execution during the Construction, all works related to our scope were thoroughly reviewed and given a confirmation to proceed on site accordingly.

 

Renovation Works 

This project included:

1. Prepare all the drawings discipline (Architectural/Structural/Services) for Ministry submission and approval with the intentions to use the drawings for site implementation.
2. Assist the client on site during the site implementation and provided review and instrcution prior to proceed construction works on site.
3. Review and approved all the material proposal by the Contractor and the Methodology suggested by the Client.

 

Consultancy & Management Works

This project included:

1. Assisting the client on the Design Concept provided to produce a detail drawings in compliance with the Maldives Regulatory Requirements as per Ministry of Tourism.
2. Structural Design were done as part of the scope for site implementation to ensure that the structure is done as per Maldives Standard.
3. Upon site execution during the Construction, all works related to our scope were thoroughly reviewed and given a confirmation to proceed on site accordingly.

 

Additional Works (Beach Bar & BoH)

This project included:

1. Prepare all the drawings discipline (Architectural/Structural/Services) for Ministry submission and approval with the intentions to use the drawings for site implementation.
2. Assist the client on site during the site implementation and provided review and 24 prior to proceed construction works on site.
3. Review and approved all the material proposal by the Contractor and the Methodology suggested by the Client.