Location – Hulhule' Island Hotel
Client – Hulhule' Island Hotel
Project Status – Completed on 2021
Hulhule’ Island Hotel As – built drawings & Master Plan preparations for refurbishment and Ministry Approval.
Project Includes:
– Visual inspection & capturing as-built measurements at site
– Detailed drawing of 2 buildings (superior wing & deluxe wing) which include architectural & services (MEP) drawings for as-built
– Surveying the site for masterplan preparations
– Detailed drawing of the masterplan
– Preparation of area program which includes built-up areas & number of units
– Preparing the required documents for approval from the Ministry Of Tourism